The facility has advised us that the UPS-B failed at ORD2. UPS-A is operating normally. Currently both the A and B feed are UP on utility power, however the site is operating at reduced redundancy while the B feed UPS is failed. The site reports their facility engineers and electricians have determined that the UPS needs to be replaced and will provide further updates upon scheduling.